Open RFP

Pratts Dam Road Bank Stabilization Project RFP

Description: The goal of this project is to re-establish the roadway by stabilizing the streambank to prevent further settlement and provide safety features meeting current PennDOT design standards to protect the traveling public. The first Phase I of this project entails a geotechnical investigation for the Pratts Dam Road. To determine the most suitable approach to stabilize the roadway, geotechnical investigations must be performed to provide the needed information to analyze and determine the best alternative for stabilization. The geotechnical investigation will be performed to characterize the existing roadbed fill, determine the underlying natural soils and locate the depth to rock. The results of the analysis and testing will establish the parameters for moving into Phase II: Design and provide the Township with the most economical solution to mitigate the existing condition. Two (2) soldier pile retaining walls were determined to be the most feasible solution.

Buyer
Released
Aug 20, 2024
Closes
Nov 12, 2026(28 days left)

RFP documents

Solicitation files and supporting documents for this bid.

  • West Brandywine Township, Chester County - pub - Pratts Dam ZIP
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts