Pratts Dam Road Bank Stabilization Project RFP
Township desires to replace the existing retaining walls along the west side of Dam Road. The work includes, but is not limited to, furnishing all necessary labor, equipment, and materials to accomplish the following: Replacement of an existing retaining wall with a soldier pile retaining wall, construction of a new, second soldier pile retaining wall, placement of rock protection along both retaining walls, drainage improvements, full depth pavement, safety feature upgrades, and other associated work.