REBID Lower Bridge Floating Dock Improvements
Posted
Oct 12, 2026
Oct 29, 2026
ITB 2026-20 seeks construction of an 8' x 30' floating dock connected to a fixed dock by an aluminum gangway. The dock is to be located along the north edge of the existing ramp at 6527 Coastal Hwy, Crawfordville. Substantial completion is required within 50 days, with final completion within 60 days.

