Well No. 10 GAC Treatment and System Upgrades
Posted
Oct 7, 2026
Nov 5, 2026
This construction IFB calls for clearing the site, demolishing and salvaging existing infrastructure, installing a new well pump and motor, and reconfiguring vault piping. It also includes a granular activated carbon treatment system with pressure vessels, prefilters, a backwash tank, and sodium hypochlorite disinfection and chemical storage. Work further covers electrical and instrumentation integration with the SCADA system and site improvements, including an access drive, equipment pads, and a stormwater drywell system.