CityMO
Posted
Sep 17, 2026
Oct 19, 2026
Water Treatment Coagulant 2027 RFP
Provide Water Treatment Coagulant (Liquid Bulk) for the period of January 1, 2027, through December 31, 2027. Prices must remain firm throughout the contract period.
Description: The City of Barrie posted an RFI titled WwTF Coagulant, classified as a goods opportunity. The posting places it in water, sewer, and wastewater-treatment categories but provides no further technical description. Responses must be submitted electronically; hard-copy submissions are not accepted.
City · ON, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Barrie.
Adjacent opportunities open for bidding right now.
CityMO
Posted
Sep 17, 2026
Oct 19, 2026
Provide Water Treatment Coagulant (Liquid Bulk) for the period of January 1, 2027, through December 31, 2027. Prices must remain firm throughout the contract period.
CountyVA
Posted
Sep 5, 2026
Nov 17, 2026
Demolition of the unused Dissolved Air Flotation (DAF) building, construction of new brick and mortar coagulant facility building on the former DAF building site to house coagulant metering pumps, lime slurry metering pumps, and associated electrical equipment. Bulk storage tanks will be stored in an outdoor concrete containment area adjacent to the brick and mortar coagulant facility building. Construction of new Sidestream Treatment Facility at existing Proctors Creek Wastewater Treatment Plan consisting of: Demolition of existing Gravity Belt Filter Building and associated utilities, construction of new Centrate Equalization basin and associated pumps, filters, equipment and appurtenances. Conversion of existing Centrate Equalization Basin to a de-ammonification Reactor, with associated vertical mixer, access walkway, effluent structure, blowers and blower canopy. Construction of new pre-engineered concrete Electrical Support Building for housing electrical drives and equipment, including Micro-nutrient chemical feed room
CountyVA
Posted
Sep 5, 2026
Nov 17, 2026
Demolition of the unused Dissolved Air Flotation (DAF) building, construction of new brick and mortar coagulant facility building on the former DAF building site to house coagulant metering pumps, lime slurry metering pumps, and associated electrical equipment. Bulk storage tanks will be stored in an outdoor concrete containment area adjacent to the brick and mortar coagulant facility building. Construction of new Sidestream Treatment Facility at existing Proctors Creek Wastewater Treatment Plan consisting of: Demolition of existing Gravity Belt Filter Building and associated utilities, construction of new Centrate Equalization basin and associated pumps, filters, equipment and appurtenances. Conversion of existing Centrate Equalization Basin to a de-ammonification Reactor, with associated vertical mixer, access walkway, effluent structure, blowers and blower canopy. Construction of new pre-engineered concrete Electrical Support Building for housing electrical drives and equipment, including Micro-nutrient chemical feed room
CityMO
Posted
Sep 16, 2026
Oct 20, 2026
Modifications to the influent pump station, including the design, fabrication, delivery, installation, process integration, start-up, warranty and delivery of operations & maintenance manual for submersible chopper pump equipment package. Selective repair of existing secondary clarifier mechanisms; application of a new coating system for each mechanism; modifications to existing below slab piping; installation of new telescoping valves. Construction of a new tertiary filtration process, including construction of a new concrete masonry unit building with galvanized steel roof trusses and standing seam steel roof; design, fabrication, delivery to site; installation; start-up; warranty; and delivery of operations and maintenance manuals for new surface filtration equipment package. Design, fabrication, delivery to site; installation; start-up; warranty and delivery of o&m manuals for new non-potable water pump station equipment package and clear well.