CityTX
Posted
-
Oct 14, 2026
Erosion Control Improvements at Big Bear Creek
Erosion control improvements.
Description: This procurement covers labor, materials, equipment, and supervision for stage addition and renovation work. The contractor will extend the existing stage using a new plywood subfloor over steel C-channel trusses and install a new wood-plank floating floor. The work also includes constructing new stage-access steps.
School · NM, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityTX
Posted
-
Oct 14, 2026
Erosion control improvements.
South Central Connecticut Regional Water Authority
Special DistrictCT
Posted
Sep 23, 2026
Oct 28, 2026
Project includes construction of a below grade valve vault and associated appurtenances, piping, a new access driveway, new drainage and stormwater management systems, new fencing and site lighting; and new electrical and other communications work to support the new valve vault equipment. Project also includes installation of approximately 1,100 feet of 36-inch ductile iron pipe (dip) transmission main, approximately 960 feet of 12-inch dip distribution main on barnes avenue, and a 36-inch tapping sleeve and valve on the existing 48-inch prestressed concrete cylinder pipe (pccp) within quinnipiac avenue. Temporary water main, temporary water services, replacement water services, and associated restoration is included in this project. Replacement or relocation of existing storm drainage and sanitary sewer service laterals on barnes avenue is also included.
South Central Connecticut Regional Water Authority
Special DistrictCT
Posted
Sep 23, 2026
Oct 28, 2026
Project includes construction of a below grade valve vault and associated appurtenances, piping, a new access driveway, new drainage and stormwater management systems, new fencing and site lighting; and new electrical and other communications work to support the new valve vault equipment. Project also includes installation of approximately 1,100 feet of 36-inch ductile iron pipe (dip) transmission main, approximately 960 feet of 12-inch dip distribution main on barnes avenue, and a 36-inch tapping sleeve and valve on the existing 48-inch prestressed concrete cylinder pipe (pccp) within quinnipiac avenue. Temporary water main, temporary water services, replacement water services, and associated restoration is included in this project. Replacement or relocation of existing storm drainage and sanitary sewer service laterals on barnes avenue is also included.
Metropolitan Water Dist Of Southern California
Special DistrictCA
Posted
Sep 23, 2026
Oct 15, 2026
Constructing four chemical containment structures, grading, paving, and appurtenant work.