Special DistrictAL
Posted
Sep 16, 2026
Oct 13, 2026
Meter Replacement Project - Contract B: Installation Only
Work includes meter replacement.
Description: Provide meter materials only.
SpecialDistrict · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
Special DistrictAL
Posted
Sep 16, 2026
Oct 13, 2026
Work includes meter replacement.
CityPA
Posted
Oct 8, 2026
Nov 5, 2026
Replacement of approx. 790 water meters with new AMI meters across Township.
Alligator Point Water Resources Board
Special DistrictFL
Posted
Sep 21, 2026
Oct 14, 2026
The District desires to advance and update the utility infrastructure to provide more detailed usage data to customers, advance notification of leaks, and improve operational performance in the non-revenue water, and meter data management. The project will consist of removing all existing ", 1", and 2" bronze bodied mechanical meters and replacing them with new solid-state meters; developing a cellular communication system for monthly billing, and customer interface for daily flow data; providing staff training, and continuing customer service.
CityGA
Posted
Jun 5, 2026
Nov 4, 2026
Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.