Higher EducationFL
Posted
Sep 25, 2026
Oct 22, 2026
Phase 4 Remodel Science Building "N" RFP
Work inlcudes remodel of science building "n" includes all building trades for a 27,298 square foot auditorium and classroom building.
Description: Work inlcudes cabinets & trim, doors frames and hardware, glass, gypsum board assemblies, acoustical ceilings, wood flooring, tile resilient and carpet flooring, acoustical wall panels, painting, building accessories, window shades, fire sprinkler, plumbing, HVAC, electrical.
HigherEducation · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Higher EducationFL
Posted
Sep 25, 2026
Oct 22, 2026
Work inlcudes remodel of science building "n" includes all building trades for a 27,298 square foot auditorium and classroom building.
Rowan-Salisbury School District
School DistrictNC
Posted
Oct 6, 2026
Oct 28, 2026
Roof replacement.
Posted
Oct 12, 2026
Oct 23, 2026
Provide building 510 substation upgrade - phase 1. The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for complete removal and upgrading of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear. This project includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling. The project also includes the installation of a new exterior substation with two new medium voltage transformers, one pad mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct bank.
CityCT
Posted
Aug 27, 2026
Oct 13, 2026
Roxbury elementary - phase 2.
Decision makers connected to this RFP from Florida State University.