FederalVA
Posted
Sep 10, 2026
Oct 26, 2026
Fire Control Panel RFP
Provide fire control panel, NSN 7R-1680-016679280-P8, REF NR 355A5340-12, QTY 2 Ea
Description: The project includes all labor, materials, equipment, services, and incidentals necessary to furnish and install a complete and fully operational electronic security PLC locking control system, fire alarm system, UPS system, touchscreen control stations, personal duress alarm system, intercom and paging system, and video surveillance systems. The work includes the upgrade and replacement of existing systems and the installation of a new fiber optic network backbone.
County · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
FederalVA
Posted
Sep 10, 2026
Oct 26, 2026
Provide fire control panel, NSN 7R-1680-016679280-P8, REF NR 355A5340-12, QTY 2 Ea
FederalVA
Posted
-
Oct 13, 2026
DLA Aviation is soliciting electronic quotations for nine units of PANEL,CONTROL,ELECTRIC (NSN 1680014687674), to be delivered to W1A8 DLA Distribution. The Combined Synopsis/Solicitation is a HUBZone set-aside under NAICS 336413, and timely quotations from responsible sources will be considered. The listed delivery requirement is 361 days after order, and responses are due October 13, 2026, at 3:00 p.m. Eastern Daylight Time.
CountyCO
Posted
Oct 2, 2026
Oct 30, 2026
This solicitation seeks bids to replace a fire alarm control panel and upgrade fire alarm devices. Arapahoe County identifies it as solicitation 26-51, with bids due October 30, 2026, at 2:00 p.m. MDT. The county’s purchasing page directs vendors to its Rocky Mountain E-Purchasing System to submit solicitations electronically.
Food Safety and Inspection Service
FederalDC
Posted
Oct 7, 2026
Oct 14, 2026
Requirement for the supply and installation of one Motor Control Center (MCC) and Programmable Logic Controllers (PLC) with Human-Machine Interface (HMI) control console to replace the existing hardwired devices and controls. Commissioning will be the joint responsibility of contractor and USDA personnel. Existing service is provided by three on site transformers providing 480 volts via a delta configuration with a corner grounded “B” phase. The current service configuration will not change. Special consideration must be applied to the application of variable frequency drives with the grounded “B” phase. Installation must include removal and demolition of existing devices (see Installation Comments in Appendix), cable trays and wiring. Supply must include all devices and controls, wiring, connectors, conduit and cable trays. All wiring and hardware must meet applicable local and national codes. Contractors must provide a new 600-amp service panel at back wall on northwest end of building 26. See attached file.
Decision makers connected to this RFP from County of Tulare.