West Virginia Department of Transportation
State AgencyWV
Posted
Sep 5, 2026
Oct 20, 2026
Structure Replacement I-79 Exit 155 Bridge Replacement RFP
Structure replacement i-79 exit 155 bridge replacement.
Description: Project consists of bridge replacement. Work includes approx 304,288 CY class 1 excavation; 3,339 LF of 18" thermoplastic pipe, group vi; 184 LF of 24" reinforced concrete pipe, type a; 412 LF of directional boring; 1 LS bridge structure; 97 LF of 54" jacking pipe, including 72" casing pipe.
StateAgency · PA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
West Virginia Department of Transportation
State AgencyWV
Posted
Sep 5, 2026
Oct 20, 2026
Structure replacement i-79 exit 155 bridge replacement.
CountyNJ
Posted
Sep 30, 2026
Oct 20, 2026
Illinois Department of Transportation
State AgencyIL
Posted
Oct 2, 2026
Nov 6, 2026
4,633 CY earth excavation; 958' grading and shaping ditches; 612 SY erosion control blanket; 120 Ton polymerized hot mix asphalt surface course, IL-9.5, mix D, N70; 955 CY concrete superstructure; 14 cal da changeable message sign; 494' short term pav marking. See outside link.
Virginia Department of Transportation
State AgencyVA
Posted
-
Nov 18, 2026
Work include 180 LF 15" storm sewer pipe; 41 LF 18" storm sewer pipe; 69 LF 24" storm sewer pipe; 17,293 CY excavation; 1,084 CY siltation control excavation; 334 LF temp. Silt fence type b; 12,168 LF rumble strip cylindrical asphalt; 14,579 LF saw-cut asphalt concrete (18 in. Depth); 153 CY conc. Cl. A4 bridge appr. Slab const. ; 4,931 CY structure excavation const; 217 LF bridge substructure rock socket drilled shaft (48" dia).
Decision makers connected to this RFP from Pennsylvania Department of Transportation.