CountyMO
Posted
Sep 29, 2026
Oct 26, 2026
Johnson County Bridge Replacement
The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
Description: Removal of the existing 16' long concrete structure, installation of a new, prestressed concrete next beam, type 28D bridge. Additional work includes, but is not limited to, installation of new guardrail and guardrail transitions in all four quadrants, new pf-1 bridge railing, and placement of new riprap for scour countermeasures; and all incidental work required, as specified in the contract document and plans.
County · IN, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyMO
Posted
Sep 29, 2026
Oct 26, 2026
The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
CountyMO
Posted
Sep 29, 2026
Oct 26, 2026
The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
Illinois Department of Transportation
State AgencyIL
Posted
Oct 2, 2026
Nov 6, 2026
4,633 CY earth excavation; 958' grading and shaping ditches; 612 SY erosion control blanket; 120 Ton polymerized hot mix asphalt surface course, IL-9.5, mix D, N70; 955 CY concrete superstructure; 14 cal da changeable message sign; 494' short term pav marking. See outside link.
Florida Department of Transportation
Special DistrictFL
Posted
Sep 25, 2026
Oct 28, 2026
The improvements under this contract consist of replacing the structurally deficient bridge culvert. The single barrel arched pipe culvert located approximately 200 feet` west, of the bridge culvert is also being replaced with a concrete box culvert and concrete barrier. Other roadway improvements are paved shoulders, drainage improvements, guardrail, concrete barrier, and signing and pavement markings. Additionally, the weir structures and splash pads at the bridge and pipe culverts are being replaced with concrete covered steel sheet pile wall, riprap, and seal concrete.
Decision makers connected to this RFP from Howard County.