Omaha Metropolitan Utilities District
Special DistrictNE
Posted
Sep 21, 2026
Oct 20, 2026
Platte South Water Production Facility Emergency Chlorine Scrubber System Replacement RFP
Emergency chlorine scrubber system replacement.
Description: Work include installation of one chlorine analysis/dosing system, and two controllers.
SpecialDistrict · PA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Omaha Metropolitan Utilities District
Special DistrictNE
Posted
Sep 21, 2026
Oct 20, 2026
Emergency chlorine scrubber system replacement.
CityNC
Posted
-
Oct 22, 2026
The Town of Stantonsburg is accepting sealed informal bids for its Water System Improvements – Phase One (Potable Water Well) project. The work generally consists of drilling a new four-inch test well, with a pilot hole approximately 500 feet deep, temporary casing and initial yield testing. Additional water-quality testing is required if the well produces the minimum yield, and contractors must obtain the complete bidding documents from the project engineer.
Fredericksburg Sewer And Water Authority
Special DistrictPA
Posted
Aug 21, 2026
Oct 14, 2026
Contract No. 1 – Pipeline Construction: Construction of approx. 1,135 LF of 10", 6,570 LF of 8", and 876 LF of 6" PVC water mains, demolition or reconfiguration of water mains at multiple locations, disinfection of pipelines, and other incidental work as indicated in the Contract Documents. Contract No. 2 – General Construction: The work of this contract generally consists of the construction of a manganese filter building, rehabilitation of the existing office building and garage, physical installation of all process equipment, chemical feed equipment, sludge wasting equipment, water recycling equipment, backwash equipment, physical modifications at Well 6, equipment modifications at the water storage tanks, process piping, chemical spill drain piping, and other incidental work as indicated in the Contract Documents. Contract No. 3 – Electrical Construction: The work of this contract generally consists of furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring for all process and other powered equipment provided under all other contracts, electrical upgrade of Well 6, installation of well controls at new wells 7 & 8, electrical installation of a mixer in the West Water Tower, demolition of the electrical service to the existing mixers in both water towers, and other incidental work as indicated in the Contract Documents. Contract No. 4 – Plumbing Construction: The work of this contract generally consists of furnishing and installing domestic cold and hot water supply piping, fixtures, accessories, point-of-use water heaters, sanitary waste and vent piping, and other incidental work as indicated in the Contract Documents. Contract No. 5 – HVAC Construction: The work of this contract generally consists of furnishing and installing heating and ventilation equipment in the proposed filter and refurbished office buildings, including air conditioning and heating units, compressor, electric unit heaters, gas unit heaters, propane tank and piping, and other related incidental work as indicated in the Contract Documents.
CitySC
Posted
Sep 16, 2026
Nov 5, 2026
The Town of Lexington’s Utility Department seeks a consultant to create and routinely update an accurate hydraulic model of its potable water distribution system. The work includes data review, demand development, facility inspection, field calibration, GIS/SCADA-compatible deliverables, program management, technical support, capital-improvement planning, and related operational guidance. The contract is time-and-materials based for five years with mutually agreed annual extensions, and eligible respondents must attend the mandatory pre-submission meeting.