New York State Department of Transportation
State AgencyNY
Posted
-
Nov 12, 2026
D265813 Culvert Replacement
Culvert replacement project.
Description: Work include 200 TN crushed aggregate size no 23; 4 EA barricade-type iii; 300 CY flowable fill; 150 SF temporary signs; 270 SY fabric-geotextile class 2 for pipe; 32 LF aluminum structural plate box culvert.
StateAgency · KY, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Kentucky Transportation Cabinet.
Adjacent opportunities open for bidding right now.
New York State Department of Transportation
State AgencyNY
Posted
-
Nov 12, 2026
Culvert replacement project.
Illinois Department of Transportation
State AgencyIL
Posted
-
Nov 6, 2026
Approx. 0.250 AC Tree removal, acres; 1,825 CY earth excavation; 135 P nitrogen fertilizer nutrient; 2,068 ft perimeter erosion barrier; 11,632 P bituminous materials (prime coat); 44 Ton incidental hot-mix asphalt surfacing; 2 EA precast reinforced concrete flared end sections 30"; 537.500 ft steel plate beam guardrail, type A, 6 ft posts; 454 ft short term pavement marking. See outside link.
CityME
Posted
Sep 5, 2026
Oct 15, 2026
Replacement of an existing 36" CMP culvert with a 48" HDPE culvert on High Road. The proposed design includes demolishing the existing culvert, new 48" HDPE culvert 45 LF in length, new concrete flow control structure, concrete headwalls, associated fill, and installation of riprap at the inlet and outlet of the proposed culvert. Roadway reconstruction work will include raising the existing roadway by approx. 1-foot, and installation of new subbase and base gravels, pavement, and guardrail.
Utah Department of Transportation
State AgencyUT
Posted
Sep 13, 2025
Nov 5, 2026
Work consists of box culvert replacement, includes, 353 CY of borrow (plan quantity); 446 CY of granular borrow; 122 ft of remove fence; 719 CY of roadway excavation; 217 CY of untreated base course; 268 ton of HMA - 1/2"; 3,881 SF of remove box culvert; 1,018 SY of strip and stockpile salvaged topsoil; 1,018 SY of broadcast seed; 61 ft of remove pipe; remove tree. See attached files.