CityVA
Posted
-
Oct 22, 2026
Asbestos Abatement & Demolition (Invitation for Bid)
Work includes: Remove all asbestos-containing material according to the asbestos survey report. Demolition work includes: The Inspections Office shall send a utility release form to have water, gas, electric, and any applicable utilities disconnected. The contractor is responsible for the disconnection of the sewage pipe. The building sewer shall be capped in the yard outside of the building with an appropriately sized combination fitting of an approved material and cleanout brought to a minimum of 12" above grade. Capped at top and bottom with like material.
